architectureHouse Extension Dublin

Planning Guide

Planning Permission for Extensions

What you can build without planning permission in Ireland since the rules changed on 27 July 2026, with a link to the official text for every rule.

What changed on 27 July 2026

A set of new exempted development regulations came into force on 27 July 2026. The rear extension limit went up from 40 to 45 sqm, side and rear dormers became exempt, the garden shed limit went up from 25 to 30 sqm, and three new exemptions arrived: a detached home in the back garden, splitting a house into two homes, and removing a chimney. Exempted development means you can build without applying for planning permission, as long as the project meets every condition of its class.

Planning exemption is not the same as building regulations. Structural work, fire safety and insulation still have to meet the Building Regulations, and the rules for garden homes and split houses say so in their own text. Rules on this page are as of 21 November 2026.

What you can build without planning permission

The main conditions for each type of home project. Each class links to its statutory instrument on the Irish Statute Book.

ProjectExempt ifRule
Rear extension (including a conservatory or an attached garage conversion)Up to 45 sqm in total, counting extensions built since 1 October 1964. Above ground level: 12 sqm on a terraced or semi-detached house, 20 sqm on a detached house.Class 1, S.I. 338/2026
Side or rear dormerUp to 30 cubic metres of internal volume (all dormers together), no higher than the roof ridge, at least 20 cm eaves setback.Class 1B, S.I. 344/2026
Roof lights on the front roofA maximum of two, each no more than 100 cm long and 90 cm wide.Class 1C, S.I. 344/2026
Chimney removalNot where the chimney is part of a stack shared with another house. The roof finish must match the existing roof.Class 2A, S.I. 343/2026
Shed, garage or garden roomUp to 30 sqm in total, behind the front wall, 4 m high with a tiled or slated pitched roof (3 m otherwise), not lived or slept in.Class 3, S.I. 338/2026
Detached home in the back garden (granny flat)Lived in together with the main house, not sold separately or let short term, 14 days' notice to the council, started and finished by 31 December 2030.Class 3A, S.I. 340/2026
Splitting a house into two homesNo more than two units, each at least 32 sqm and self-contained, 14 days' notice to the council, started and finished by 31 December 2030.Class 1A, S.I. 339/2026

Rear extensions: the 45 sqm rule

Class 1 covers an extension to the rear of the house, including a conservatory, and turning an attached garage or shed at the rear or side into part of the house. Up to 45 sqm is exempt, counting every extension built since 1 October 1964. Only 12 sqm of that can be above ground level on a terraced or semi-detached house (20 sqm on a detached house), and any upper floor must be at least 2 m from a party boundary. That is why most two-storey rear extensions still need planning permission.

The walls can't be higher than the rear wall of the house (or its side walls where the rear has a gable), and a flat roof can't rise above the eaves or parapet. At least 25 sqm of private open space must be left, ground-floor windows must be at least 1 m from the boundary they face and upper-floor windows at least 8 m, and the roof can't be used as a balcony or terrace. Prices for each size are in our house extension cost guide, and our kitchen extensions page shows what fits inside the limit.

Dormers and roof lights

A dormer to the side or rear of the house is exempt under Class 1B if its internal volume, together with any other dormers, is no more than 30 cubic metres, it is no higher than the roof ridge and it keeps at least 20 cm of eaves setback. Class 1C allows up to two roof lights on the front roof plane, each up to 100 cm by 90 cm. A front dormer, a larger dormer or a hip-to-gable roof change is not covered and needs full planning permission. Our attic conversions page covers Velux, dormer and hip-to-gable options.

Garden rooms and garden homes

Class 3 covers sheds, garages, garden rooms and similar structures: up to 30 sqm in total, behind the front wall of the house, no taller than 4 m with a tiled or slated pitched roof (3 m otherwise), and not used to live or sleep in.

A garden home that someone lives in (a granny flat) falls under Class 3A instead. It must be a permanent building, not a caravan or mobile home, lived in together with the main house, with no separate utility connections, no new access onto the road, and at least 0.6 m from any wall or party boundary. The owner must live in the main house, and the council needs 14 days' notice with the Eircode before work starts. On size, paragraph 7 of the regulations mentions 32 square metres and caps the total, together with any Class 3 sheds or garden rooms, at 45 square metres. The exemption runs to 31 December 2030.

Splitting a house and removing a chimney

Class 1A lets you split a house into no more than two self-contained homes, each at least 32 sqm, with 14 days' notice to the council. Works must start and finish by 31 December 2030, and it can't be combined with a garden home under Class 3A. Class 2A exempts removing a chimney, unless the stack is shared with a neighbouring house, with the roof finished to match and nesting birds and bats protected. Both often go with a full home renovation.

When you still need planning permission

The statutory decision period is 8 weeks from a valid application, and requests for further information commonly push that to 12 to 16 weeks. Glass projects follow the same rear extension rules: see glass extensions and modern extension design. We check exemption at the free site survey and confirm it in writing before quoting.

Planning permission questions

What size extension is exempt from planning permission in Ireland?expand_more
Since 27 July 2026, a rear extension of up to 45 sqm can be exempt from planning permission (Class 1, S.I. No. 338 of 2026). The 45 sqm includes any extensions built since 1 October 1964. Above ground level the limit is 12 sqm on a terraced or semi-detached house and 20 sqm on a detached house, at least 25 sqm of private open space must be left, and the walls can't be higher than the rear wall of the house.
Can I build a dormer without planning permission?expand_more
Yes, if it is to the side or rear. Class 1B (S.I. No. 344 of 2026) exempts a side or rear dormer with an internal volume of no more than 30 cubic metres, counting any other dormers, as long as it is no higher than the roof ridge and keeps at least 20 cm of eaves setback. A front dormer or a bigger dormer still needs planning permission.
What is the biggest shed or garden room I can build without planning?expand_more
All sheds, garages, garden rooms and similar structures together can come to 30 sqm (raised from 25 sqm on 27 July 2026, S.I. No. 338 of 2026). They must sit behind the front wall of the house, be no taller than 4 m with a tiled or slated pitched roof (3 m otherwise), leave at least 25 sqm of private open space, and nobody can live or sleep in them.
Can I build a granny flat without planning permission?expand_more
Yes, under Class 3A (S.I. No. 340 of 2026), if every condition is met: the garden home is lived in together with the main house and isn't sold or let short term, the main house is the owner's main home, it has no separate utility connections, it is no taller than 4 m with a tiled or slated pitched roof (3 m otherwise), it stays at least 0.6 m from walls and boundaries, 25 sqm of private open space is kept, and the council gets 14 days' notice with the Eircode. On size, paragraph 7 mentions 32 square metres and caps the total, together with any Class 3 sheds or garden rooms, at 45 square metres. Works must start and finish by 31 December 2030.
Can I split my house into two homes without planning permission?expand_more
Yes, under Class 1A (S.I. No. 339 of 2026). The house can be split into no more than two units, each at least 32 sqm and self-contained apart from shared access. You must notify the council at least 14 days before work starts, with the Eircode, and the works must start and finish by 31 December 2030. It can't be used where a detached garden home has already been built under Class 3A, and the Building Regulations, including fire safety, still apply.
Do I need planning permission to remove a chimney?expand_more
Not usually, since 27 July 2026. Class 2A (S.I. No. 343 of 2026) exempts the removal of a chimney from a house, except where it is part of a joint chimney stack with a separate house. The roof finish must match the existing roof, and the work must respect the Wildlife Act protections for nesting birds and bats.
How long does planning permission take in Ireland?expand_more
The statutory decision period is 8 weeks from a valid planning application, though requests for further information commonly extend that to 12 to 16 weeks in practice. Including design, budget 6 to 9 months from first drawings to the end of the build for a project that needs full planning permission.

More cost and planning answers are on our FAQ page.

Not Sure If Your Project Is Exempt?

Book a free site survey. We check the rules against your house and confirm exemption in writing before you commit.